With our excellent management, strong technical capability and strict quality control system, we continue to provide our clients with reliable quality, reasonable prices and excellent services. We aim at becoming one of your most reliable partners and earning your satisfaction for New Arrival China preform injection molding machine , filter mould Manufacturer in Estonia, We are confident to make great achievements in the future. We are looking forward to becoming one of your most reliable suppliers.
2.Mould design:we will Communicate&Exchange the opinion with you after you place order.
3.Material Purchase:Steel cutting and Mould base tooling.
4.Assembling.
5.Inspection of mould : following and controlling the tooling processing.
6.Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!
7.Your instruction &confirmation for shipment.
8.Ready made mould before packing.
Package of injection molding :
1. Wooden carton ,
2. shipping by sea ,by load ,
3. We also can produce any plastic parts for you . We have 25 different ton injection machine .
Pictures of preform injection molding machine, filter mould:
Company Information
1. Office corner
2. Equipments 3.Working place
4. Package and delivering
5. Certification
6. Our customer
FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service
1. How about your payments item ?
Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).
2. Delivering time ?
Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .
3. Ability of producing ?
We have all tooling machine for making molds, we can provide 30-50 sets of molds every month .
The current status of my corolla CE, after I posted the video back in 2013 about installing my radio and some leds. I’ve done many things since then:
NOT shown on video: •Megan Racing lower middle bar. •Ultra Racing rear strut bar
•TRD Front strut bar
•OEM rear bumper cover
•LEDs everywhere replacing the yellow bulbs, including shift selector and those in rear view mirror.
•Dash cover
• Window visors
•Full THULE roof rack
•Corolla LE Chrome accents (e-brake & A/C vent tips)
•Corolla LE dual compartment arm rest (from a 2003 LE)
•Chrome door handles (will buy OEM ones soon)
•Corolla LE/S tweeters & tweeter covers (from a 2004 LE)
•2005-2008 Corolla LE cluster (from a 2005)
•Corolla LE woodgrain console and switches (from a 2007)
•Corolla LE/S rear view mirror (from a 2005 LE)
•Intermitent wiper switch (from a 2004 LE)
•eBay foglight kit (holding up good until now)
•Hikaru 6000k HIDs on fogs and low beams.
•Still rocking the blue halogen bulbs on the high beams, the same ones from the 2013 video.
•Sickspeed black socks on PS and brake reservoirs and intake mani (for looks)
•Engine cover is from a 2002 celica, with Synth Oil only (car has been synthetic since 100k miles, it has 130k)
•Big 3 Upgrade
•Fumoto valve for easier oil changes
•Alternator, starter, engine mounts, cv and ball joints, and exhaust maintenance has been done.
•AEM drop in filter
•Pyle alarm with starter disable and trunk opener.
•Steering wheel toyota logo replaced since it was scratched.
•TRD seat belt covers (Given to me for free by a friend, another toyota enthusiast)
Plans:
•03-04 1ZZ-FE supercharger (will take some hunting to do)
•DC sports headers w/ Magnaflow high flow converter.
•2ZZ water pump
•MWR water pump and alternator pulleys.
•Lightweight crankshaft pulley (1ZZ engine is internally balanced, no need for heavy stock pulley.)
•Tokico Blue shocks or KYB shocks.
•Poly bushings in control arm and rear axle beam.
•I already have Tein H tech springs I haven’t installed yet.
•I have 2005 Celica GT-S wheels I will be installing soon.
May 17-23, 2017: repainted my rear bumper with spray can, and last using rust oleum clear coat, pretty amazed for a spraycan job, bumper was dull and scratched.
° All of the things I mentioned on the car, done by myself completely.
PROJETO COMPLETO SÓ R$ 10,00 QVE e HAMMER
deposito, bancos Caixa AG. 0424 Op. 013 Conta 39956-3 ou
BB AG 0466-9 Conta Corrente 21.774-3
em nome de Orion Bauer enviar comprovante para orion_bauer@hotmail.com para eu retorna com o link para vc baixar. Vale cada centavo, assim vc só compra o que vai usar, sem desperdício de materiais e sem ficar perdendo tempo para montar.
Ou pelo Mercado Livre
Podem olhar os comentários de quem comprou no Mercado Livre todos estão satisfeito.
Vale cada centavo e você economiza tempo e dinheiro!