owing to good service, a variety of high quality products, competitive prices and efficient delivery, we enjoy a good reputation among our customers. We are an energetic company with wide market for Hot sale good quality pp injection molding, top injection molding machine manufacturers in Mexico City, items won certifications with the regional and international primary authorities. For far more detailed information, please contact us!
Quick Details
Place of Origin: Zhejiang, China (Mainland)
Product Material: P20H ,718H, 2316 ,Nak80 ,S136
Mold life: 30K,50K,100K
HRC: 32-48
Brand Name: none
Product: auto parts mould
Runner: hot or cold
Payments item: half and half
Model Number: EHM19
Name:pp injection molding, top injection molding machine manufacturers
Solfware: Pro-E, UG, solide worker, CAD
T1 time: 30days after drawing confirmed with both side
Shaping Mode: Plastic Injection Mould
Other name: injection molding , mold dies , plastic mold machine
pp injection molding, top injection molding machine manufacturers
Product Description
Specifications ofpp injection molding, top injection molding machine manufacturers:
mould material
45#,P20,H13,718,2738,NAK80,S136 etc.
mould base
LKM,HASCO ect.
Cavity
Single/multi
Runner
Hot/cold
Mould life
P20:300,000-500,000 shots
2316 718H:500,000 shots
S136 H13:700,000 shots
Design software
UG,PROE,CAD etc.
Plastic material
PP,PE,ABS,PC etc.
Delivery time
35-45days
Specification
According to client’s requirements
1.Samples/Drawing &Requirement from you
2.Mould design:we will Communicate&Exchange the opinion with you after you place order.
3.Material Purchase:Steel cutting and Mould base tooling.
4.Assembling.
5.Inspection of mould : following and controlling the tooling processing.
6.Mould testing:We will inform you the date.Than will send the sample’s inspection report&injection parameters with the sample to you!
7.Your instruction &confirmation for shipment.
8.Ready made mould before packing.
Package of injection molding :
1. Wooden carton ,
2. shipping by sea ,by load ,
3. We also can produce any plastic parts for you . We have 25 different ton injection machine .
Pictures of pp injection molding, top injection molding machine manufacturers:
Company Information
1. Office corner
2. Equipments 3.Working place
4. Package and delivering
5. Certification
6. Our customer
FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service
1. How about your payments item ?
Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery).
2. Delivering time ?
Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering .
3. Ability of producing ?
We have all tooling machine for making molds, we can provide 30-50 sets of molds every month .
pp injection molding, top injection molding machine manufacturers
The current status of my corolla CE, after I posted the video back in 2013 about installing my radio and some leds. I’ve done many things since then:
NOT shown on video: •Megan Racing lower middle bar. •Ultra Racing rear strut bar
•TRD Front strut bar
•OEM rear bumper cover
•LEDs everywhere replacing the yellow bulbs, including shift selector and those in rear view mirror.
•Dash cover
• Window visors
•Full THULE roof rack
•Corolla LE Chrome accents (e-brake & A/C vent tips)
•Corolla LE dual compartment arm rest (from a 2003 LE)
•Chrome door handles (will buy OEM ones soon)
•Corolla LE/S tweeters & tweeter covers (from a 2004 LE)
•2005-2008 Corolla LE cluster (from a 2005)
•Corolla LE woodgrain console and switches (from a 2007)
•Corolla LE/S rear view mirror (from a 2005 LE)
•Intermitent wiper switch (from a 2004 LE)
•eBay foglight kit (holding up good until now)
•Hikaru 6000k HIDs on fogs and low beams.
•Still rocking the blue halogen bulbs on the high beams, the same ones from the 2013 video.
•Sickspeed black socks on PS and brake reservoirs and intake mani (for looks)
•Engine cover is from a 2002 celica, with Synth Oil only (car has been synthetic since 100k miles, it has 130k)
•Big 3 Upgrade
•Fumoto valve for easier oil changes
•Alternator, starter, engine mounts, cv and ball joints, and exhaust maintenance has been done.
•AEM drop in filter
•Pyle alarm with starter disable and trunk opener.
•Steering wheel toyota logo replaced since it was scratched.
•TRD seat belt covers (Given to me for free by a friend, another toyota enthusiast)
Plans:
•03-04 1ZZ-FE supercharger (will take some hunting to do)
•DC sports headers w/ Magnaflow high flow converter.
•2ZZ water pump
•MWR water pump and alternator pulleys.
•Lightweight crankshaft pulley (1ZZ engine is internally balanced, no need for heavy stock pulley.)
•Tokico Blue shocks or KYB shocks.
•Poly bushings in control arm and rear axle beam.
•I already have Tein H tech springs I haven’t installed yet.
•I have 2005 Celica GT-S wheels I will be installing soon.
May 17-23, 2017: repainted my rear bumper with spray can, and last using rust oleum clear coat, pretty amazed for a spraycan job, bumper was dull and scratched.
° All of the things I mentioned on the car, done by myself completely.
Here is another easy way to disconnect the EGR system from the Nissan VG33E Engine Intake Plenum Manifold. Has part of removing the intake plenum removal, here is a easy and best way to ease manifold removal.